For industrial project buyers

Send RFQs. Collect bids. AI organizes. You decide.

Supplier spreadsheets, PDFs and emailed bids become one reviewable comparison. Less rekeying. Clear exceptions. The award decision stays with you.

No account needed. Talk to us about your workflow →

PLANT EXPANSION · SAMPLE

Pelican Construction

Disqualified$119,400

Prohibited switchgear substitute · transformer 42 days (needed in 21).

C alone$126,800

All six lines · compliant · on time

Why B + C? Lowest price among the compared options that meet every spec and the 21-day deadline.

From RFQ to award

Less rekeying.
More time for the decision.

01 / Prepare & send

One version. The right suppliers.

Bring the requested lines, specifications and need-by date into one RFQ package. Send the same revision to your distributors.

02 / Receive

Their formats. Your request.

Bring back spreadsheets, PDFs and emailed bids. Keep each original connected to the supplier and RFQ revision.

03 / Organize & review

AI takes the first pass.

Turn varied replies into a shared bid tab. Check source lines, correct uncertain matches and resolve substitutions and delivery exceptions.

04 / Decide

Catch quote exceptions before you award.

Compare complete, workable supplier combinations. Keep the evidence and your reason for the choice.

Pelican Construction · Sample tour

Three different replies.
One reviewable bid tab.

Product vision: AI-assisted intake across supplier formats.

PDF

Distributor A

A-quote-r1.pdf
Page 2 · line 3

“XFMR · 2 EA · $12,000 · 42 days”
XLSX

Distributor B

B-pricing-r1.xlsx
Pricing tab · row 4

“Transformer · 2 · $11,500 · 28 days”
EMAIL

Distributor C

C-reply-r1.eml
Body · item 3

“2 transformers · $11,800 each · 10 days”
AI first pass

Keep the source. Flag the uncertainty.

A’s “XFMR” needs a match. Its original wording, page and line stay beside the proposed RFQ line.

Buyer review

Confirm the line. Check the date.

Buyer correction: “XFMR” → Transformers · RFQ line 3. The 42-day lead time remains a schedule exception against the 21-day need.

Now compare the whole package: $119,400 disqualified · C $126,800 · B + C $123,200.

Follow the request through the decision →

One industrial purchasing vision

Across trades.
Grounded in the details.

Quote Track is designed for industrial purchasing, from material packages to defined scopes. The interactive example uses electrical components; the same decision framework spans trades where coverage, specifications, timing, and price determine the award.

The 60-second walkthrough

See the exception.
Understand the decision.

A low quote. Two exceptions. A decision you can explain.

60 seconds · English captions · Download captioned video

Read the walkthrough transcript

The lowest quote is one hundred nineteen thousand four hundred dollars. But the switchgear is a prohibited substitute, and the transformer takes forty-two days. The project needs it in twenty-one.

For Pelican Construction’s plant expansion, bring the request and three supplier quotes into Quote Track.

Three supplier quotes. Checked in under two minutes. That’s the workflow we’re building: coverage, specification, and delivery, checked together.

Zoom in. B’s twenty-eight-day transformer is also late. C’s ten-day option meets the need.

C covers all six lines on time for one hundred twenty-six thousand eight hundred dollars.

Combine B’s switchgear and panels with C’s remaining lines: one hundred twenty-three thousand two hundred dollars. Three thousand six hundred less.

A compliant package. An achievable schedule. A decision you can explain.

Catch quote exceptions before you award. Explore the demo at Quote Track dot net, slash demo.

  1. 01 · The risk$119,400, a prohibited substitute and a 42-day transformer.
  2. 02 · The reviewCoverage, specifications and delivery against a 21-day need.
  3. 03 · The decisionC at $126,800. B + C at $123,200. $3,600 less.

Product vision: three supplier quotes checked in under two minutes.

Prefer to explore at your own pace?

Review the documents, compare the quotes, and explore the supplier allocation.

Explore the interactive demo

Let’s talk about your workflow.

Have a question or want a closer look at Quote Track?

Contact us

A closer look

What does the walkthrough cover?

A six-line electrical package, three supplier quotes, specification and delivery exceptions, and a comparison of feasible supplier combinations.

How are the suppliers compared?

Coverage comes first, then delivery risk, then price. Exact-match requirements exclude prohibited substitutions before the comparison.